Step 4
B
a) Ask for assistant to lift the assembled unit upright and position it at the desired location
against a wall. If necessary, adjust the pre-attached Floor Levelers at the bottom of the
Side Frames (B and C) to level the unit.
b) Attach three Cord Clips (H6) to the desired location to organize your cords properly,
using two 12 mm Screws (H5) per clip. Be sure not to crack the edges.
c) Route the cords through the cord clips for cord management.
Need Assistance? Visit us at: samsclub.com/membersmarkhelp
H5 x 6
H6 x 3
A
B
C
Floor leveler
11 |
P a g e