Installing The In-Use Cover And Changing The Fuse - Mettler Toledo PE360 DeltaRange Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE: Installing the in-use cover and changing the fuse
To protect the balance against dirt, damage and caustic chemical substances, the balance is shipped with an installed in-use cover. The in-use cover is made of hard
plastic and cannot be folded. Operation of the balance is in no way hindered by the in-use cover.
In case the microfuse needs to be replaced, there is a spare fuse in the fuse holder. If the microfuse needs to be replaced repeatedly for no obvious reason, contact
METTLER TOLEDO Service.
Removing the in-use cover
– Remove weighing pan and pan support.
– Turn retaining ring (25) (in the PE360, the
draft shield base (19)) counterclockwise until
it snaps free and can be lifted out.
– Remove in-use cover (26).
– Place pan support and weighing pan back on
balance.
(The retaining ring is installed in the PE3600 only if
an in-use cover is used).
16
Installing the in-use cover
– Remove weighing pan and pan support.
– First hook up in-use cover on the rear of
balance housing and then pull it tight at the
balance front.
– Place retaining ring (25) (in the PE360, the
draft shield base) then turn clockwise to stop
position.
– Place pan support and weighing pan back on
balance.
Replacing the microfuse
– Disconnect the power cable.
– Remove the fuse holder (4) with a screwdriver.
– Remove defective fuse and install a new fuse
(Spare fuse is in the fuse holder).
Fuse values:
125 mA slow-blowing with 95...120 V
63 mA slow-blowing with 190...240 V
– Reinsert fuse holder.
– Plug power cable back in.

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pe3600 deltarange

Tabla de contenido