Laying Out With Coordinates - Hilti POS 15 Manual De Instrucciones

Ocultar thumbs Ver también para POS 15:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Up
Down
Layout results
en
Screen showing the layout differences in terms of line, offset and height based on the last target point measurement.
NOTE
If the option to include heights was not set when the station was set up, height values and all associated information
are not displayed.
Saving layout data with building control lines
Pt ID
Line (entered)
Offset (entered)
Height (entered)
Line distance (measured)
Offset (measured)
Height (measured)
dO
dL
dH

11.1.3 Laying out with coordinates

Entering the layout points
The layout values with point coordinates can be entered in three different ways:
1.
Manual entry of point coordinates.
2.
Selection of point coordinates from a list of points saved in memory.
3.
Selection of point coordinates from a CAD drawing with points saved in memory.
54
The tip of the reflector must be moved upwards by the
amount indicated.
The tip of the reflector must be moved downwards by
the amount indicated.
Return to entry of layout values.
Save the layout values and last
differences.
Enter the next point.
Name of layout point.
Line distance entered relative to the building control
line.
Offset distance entered relative to the building control
line.
Height entered.
Line distance measured relative to the building control
line.
Offset distance measured relative to the building con-
trol line.
Measured height.
Difference in offset value based on the building control
line. dO = offset (measured) – offset (entered)
Difference in line value based on the building control
line. dL = line (measured) – line (entered)
Difference in height. dH = height (measured) – height
(entered)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pos 18

Tabla de contenido