3.
With the ability now to wiggle the discharge chute tube back and forth, slide
it over the chute elbow mounted on the cutting deck, as shown in Figure 24.
4.
Continue to work the discharge chute down over the chute elbow until the
groove on the discharge chute aligns with the upper chute support, as seen
in the inset of Figure 25.
5.
Close the grass catcher cover.
ASSEMBLY AND INSTALLATION
Figure 24
Figure 25
14