Commissioning; Changing The Assembly Location; Selecting The Anchors - Nussbaum ATT COMBI LIFT CL 4.40 S Instrucciones De Servicio

Libro de inspeccion
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.2

Commissioning

i Before commissioning, a single safety inspec-
tion must be done (use the "single safety in-
spection" form).
If the lift set up is done by a specialist (factory
trained assembler) then he can also do the safety
inspection. If the set up is done by the operating
company then a specialist must be tasked with the
safety inspection. The specialist confirms seamless
operation of the lift on the set up protocol for sin-
gle safety inspection and releases the lift for use.
i After commissioning, the set up protocol must
be completed and sent to the manufacturer.
4.3

Changing the assembly location

To change the assembly location the pre-con-
ditions must be met according to the assembly
guidelines. The location change is to be done
according to the following sequence:
• Remove the pull spring at the bottom of the sa-
fety ratchet (13)
• Lower the lift to the lowest position
• Remove the safety ratchet. If required manually
pull back the safety ratchets (14)
• Loosen and remove the unit cover (12).
• Raise the lift and set down the drive-in rails onto
assembly stands
• Disconnect power using the main switch (7)
• Suction off hydraulic oil
• Remove hydraulic lines and seal off with blind
stoppers
• Loosen electrical plug connections
• Loosen the anchor fastenings
• Remove the lift column
• Loosen and remove cross-beams
48
COMBI LIFT 4.40 S-S A-S PLUS-S PLUS AMS - HYMAX II 4000 S-S A-S PLUS-S PLUS AMS
• Transport the lift to the new assembly location
• Assemble the lift according to the procedure
during assembly and anchoring before first com-
missioning.
Use new anchors.
The old anchors are no longer fit for
purpose!
i Before re-commissioning, a safety inspection
must be done by a specialist (use the regular
safety inspection form).
4.4

Selecting the anchors

We recommend the following fastening anchors
(without screed and floor tiles) to comply with the
specifications from the foundation plan such as
concrete quality, concrete thickness etc.:
HILTI
• Anchor rod HIT-V-5.8 M12x150 grouting mortar
• Anchor rod HIT-Z M12x155 grouting mortar HIT-HY
200-A
i Similar value anchors and other known brands
of anchor manufacturers can be used when
considering the conditions.
25.09.2015
20110006 OPI

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Att combi lift cl 4.40 s aAtt combi lift cl 4.40 s plusAtt combi lift cl 4.40 s plus amsAtt hymax ii 4000 sAtt hymax ii 4000 s aAtt hymax ii 4000 s plus ... Mostrar todo

Tabla de contenido