11
FLOOR FASTENING KIT
All floor fastening actions must be carried
out inside the shed.
To fasten the side and back walls (part HS):
Long side
down
Repeat this step for all circled locations on the diagram above.
12
FLOOR FASTENING KIT
To fasten the front wall (parts HRP, HLP):
sC15(X18)
HCS(X18)
sC15(X4)
HCf(X4)
HCS x 18
sC15 x 18
HCF x 4
sC15 x 4