Descargar Imprimir esta página

Kohler K-T314 Guia De Instalacion página 4

Guarnición de grifería de montaje en cubierta o banera
Ocultar thumbs Ver también para K-T314:

Publicidad

Idiomas disponibles

Idiomas disponibles

1-1/4"
(3.2 cm)
2. Prepare for Spout Installation
Remove the plaster guard from the spout supply tube.
Cut off the spout supply tube 1-1/4" (3.2 cm) above the rim,
finished deck, or tile.
Remove all burrs from the supply tube to prevent damage to the
O-ring seal.
NOTE: The washer is not needed for rim/finished deck installation.
If the installation includes a tile covered rough deck, slide the
washer, flat side facing forward, onto the supply tube.
1012557-2-B
Washer
Spout
Supply
Tube
Tile
Finish
Rough
Deck
4
Finished
Deck
Rough
Deck
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-t333