Descargar Imprimir esta página

Member's Mark Greyson SM3FBKCS Instrucciones De Ensamble página 18

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 12
H6 x 2
1
2
Metal bracket
Long screw
3
Short screw
Connector
4
Wall
Steel cable
a) Unpack the units and confirm that you have all hardware and required parts.
b) Ask for assistance to lift the unit upright and adjust the pre-attached floor levelers to level the unit at the
desired location against a wall.
c) Now, follow the instructions printed on the plastic bag containing the Tipping Restraint Hardware to attach
the tip-over restraint to the unit and the wall.
NOTE: The tipping restraint hardware included is for wooden stud wall construction. It must be attached to
a wall stud. Depending upon your wall construction, different anchor hardware maybe required. Please
contact your local hardware store for assistance. Young children can be seriously injured by tipping furniture.
You must install the Tipping Restraint Hardware with the unit to prevent the unit from tipping, causing any
accidents or damage. The tipping restraints are intended only as a deterrent, they are not a substitute for
proper ad ult supervision. The tipping restraints are not earthquake restraints. If you wish to add the extra
security of earthquake restraints, they must be purchased and installed separately.
Wall
Wooden stud
Wall
H6
Need Assistance? Visit us at: samsclub.com/membersmarkhelp
1
2
3
4
Wall
18
Floor leveler

Publicidad

loading

Este manual también es adecuado para:

Greyson sm3fbkcs-e