Descargar Imprimir esta página

Home Decorators Collection WAVERLY 60 GBSH164 Manual De Instalación página 22

Publicidad

Idiomas disponibles

Idiomas disponibles

11
11.1-11.3. Install the 2 short seal strips (R) onto the glass panels. Install the 2 glass panel vertical seal strips (N). Cut the surplus
at the top of the vertical seal strips (N). Install the door vertical seal strip (J) on the closing end. For the door vertical seal strips,
they should start right above the door bottom seal strip (M). For the fixed panel, the vertical seal strip should start right above
the door guide (O).
11.4. If the bottom seal (M) interferes with the edge of the shower base (if any) when the door is closed, the corner of the bottom
seal can be cut to fit the shape of the shower base as shown.
11.5. Position the 2 roller stoppers (D) in order to block the door panel (I) from hitting the wall when opening it or closing it. Use
the Allen key to strongly secure the stopper when the final position is found.
11.1
R
I
B
11.3
I
J
M
SEAL STRIPS INSTALLATION
D
B
J
R
N
D
I
J
M
11.2
N
B
11.4
J
M
11.5
D
I
PAGE 22

Publicidad

loading

Este manual también es adecuado para:

Waverly 60 gbsh169Waverly 60 gbsh177