Descargar Imprimir esta página

Ecoflam BLU 500 P AB Manual De Instrucciones página 13

Quemadores de gas de aire soplado

Publicidad

Idiomas disponibles

Idiomas disponibles

MANUAL RELEASE
SWITCH
"PAB" VERSION GAS BURNERS GAS TRAIN INSTALLATION AND SETTING INSTRUCTIONS
Fix the gas train to burner body by means of the 4 screws of the flange, pay attention to set correctly the gasket ( O-
ring ).
Connect electrically the gas train with the 6 pole plug.
Switch on the burner (it has already been tested in the factory, so it is pre set on average values) and verify the tightness
of gas train connections made during installation.
Act as follows to adapt the burner output to the boiler.
HIGH FLAME
1. Bring the burner in high flame , air inlet must be set at 75 ° (maximum opening position).
To adjust air capacity operate on the combustion head position.
Just in peculiar case it is necessary to reduce the air flow in high flame closing air intake damper.
2. The position of gas butterfly valve must be lower then 90° ( typically 85°. It is important not get over 90° to obtain
a perfect combustion during passage from high to low flame). Eventually adjust this position acting on the screw "1 ",
after loosening nut " 2 ".
3. Regulate gas capacity in high flame through the gas governor, or operate on the adjustable gas valve.
LOW FLAME
4. Choose the first stage position on the servocontrol ( normally between 10° - 30°) on the basis of the redu
ge output required and switch the burner to low flame.
5. Regulate gas capacity, to obtain optimal combustion, changing the position of the gas valve disc, act on screw " 3 ",
after loosen nut " 4 ".
Error diagnosis
Error message
Flash-Code
lockout
safety time
air proving switch
in closed position
air proving switch
time-out
air proving switch
opened
loss of flame
Flash-Code for manual lock out
manual/external
lock out
LANDIS & STAEFA SQN 30 151A2700 AIR
DAMPER MOTOR
Remove cover to gain access to the adjusting cams.The cams are to be
adjusted through the suitable key provided for. Description:
I
(Max. power)
II - Limit switch for the air damper position at burner's shut down
III - Limit switch for air damper "Low Flame" position adjustment
(Min. power)
V - Limit switch for 2nd stage's solenoid valve opening release
NOTE : Cam V (to allow the 2nd stage's solenoid valve opening) must
be adjusted to an intermediate position between the Low and High
Flame ones (to an angle approximately 5° greater than the low flame
position).
Possible fault
within lock out safety time
no flame establishment
air proving switch
contact welded
air proving switch does not
close within specified time
air proving switch opens
during start or operation
loss of flame during operation
- Limit switch for air damper "High Flame" position adjustment
pag.13
LB 1208 Blu 500 ÷ 1400 P AB
B
ced char-

Publicidad

loading

Este manual también es adecuado para:

Blu 700 p abBlu 1000 p abBlu 1200 p abBlu 1400 p ab