Twin-Star International 73719/23MM6072VMA Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Insert one Wood Dowel (CC) into each of the
pre-drilled holes.
Using two (2) persons lift and attach the completed
front assembly from step 5 to the Center Shelf (G)
as shown in diagram. Make sure that Wood Dowels
(CC) are seated into the pre-drilled holes in the
hearth/base. Using Bolt (AA) and Washer (BB)
attach panels through pre-drilled holes in the
mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
Bolt
AA
1/4 in. x 1-1/4 in.
Washer
BB
1/4 in. x 3/4 in.
CC
Wood Dowel
7. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 6. Then locate Mantel/Top (K) and lay
fi nished side up on top of completed assembly.
From the inside, attach Mantel/Top (K) using Bolt
(AA) and Washer (BB) through the pre-drilled holes
in the mounting blocks.
HAND TIGHTEN ONLY.
Using Phillips head screwdriver tighten all Bolts
alternating top and bottom, left and right.
Hardware Used
Bolt
AA
1/4 in. x 1-1/4 in.
Washer
BB
1/4 in. x 3/4 in.
CC
Wood Dowel
8. Locate Back Panel (M) and Center Back Panel (L),
attach to the back of the completed assembly from
step 7. Use a Phillips Head screwdriver, tighten
screws (EE) through the pre-drilled holes in the
Back Panels to the completed assembly.
Then use a Phillips Head Screwdriver to tighten the
bolts that were left hand tightened.
Hardware Used
EE
Screw
Fig. 6
CC
x 4
x 4
x 4
Fig. 7
CC
x 6
x 6
x 5
Fig. 8
x 37
8
AA
BB
CC
G
K
AA
BB
EE
EE
L
M
CC
M

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido