Dimensions; Installation Example; Assembly Instructions; Function - Franke AQRE430 Instrucciones De Montaje Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 16
6.

Dimensions

7.

Installation example

8.

Assembly instructions

8.1
Flush the pipe in accordance with DIN 1988.
Removal of the upper part of the flusher is not required for clearances between the
water connection and the top edge of the urinal of over 145 mm. Remove the upper
part of the flusher.
8.2
Seal the fitting and screw on.
8.3
Remove the outgoing nut with a face spanner Order No.: 2000105835.
8.4
Assemble upper part of flusher, battery and cover in reverse order.
8.5
Shorten the flushing pipe by the length (D).
D = L – (x + 36 mm).
8.6
Insert the urinal connector in the inlet opening of the urinal.
8.7
Push the flushing pipe in the urinal connector.
8.8
Tighten the outgoing nut with the face spanner.
9.

Function

9.1
Stand in front of the urinal for at least 10 seconds.
9.2
Flushing starts after moving away.

10. Adjusting the flush volume

10.1 Set the flow volume regulator to "fully opened" (siehe
10.2 Loosen and remove the cover using a hexagon socket key (SW 2)
(siehe
Kapitel
10.3 Remove the battery.
10.4 Reinsert the battery after approx. 5 seconds.
10.5 Keep your hand 5 – 10 cm in front of the sensor.
The LED flashes quickly.
10.6 After 5 seconds the indicator lamp automatically turns off.
10.7 Remove your hand from the sensor range (min. 60 cm).
10.8 Keep your hand 5 - 10 cm in front of the sensor. The LED flashes.
2 flashes, pause, 3 flashes, pause, 4 flashes, etc.
13.).
Kapitel
11.).
5

Publicidad

Tabla de contenido
loading

Tabla de contenido