Descargar Imprimir esta página

Watts AMES 4000SS Serie Manual De Instalación & Mantenimiento página 6

Conjunto de zona de presión reducida
Ocultar thumbs Ver también para AMES 4000SS Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Testing Reduced Pressure Zone Assemblies
Follow the requirements of each test when performed to ensure
successful installation, operation, and maintenance of the backflow
preventer.
Test No.1
Purpose: To test check valve No. 2 for tightness against
reverse flow.
Requirements: Valve must be tight against reverse flow under
all pressure differentials. Slowly open the 'high' valve A and the
'vent' valve C, and keep the 'low' valve B closed. Open test No.
4. Indicated pressure differential is expected to decrease slightly.
If pressure differential continues to decrease (until the vent opens)
check valve No. 2 is reported as 'leaking.'
Test No. 2
Purpose: To test shutoff No. 2 for tightness.
Requirements: After passing test No. 1, continue to test No. 2
by closing test cock No. 2. The indicated pressure differential is
expected to decrease slightly. If pressure differential continues
to decrease (approaching 'zero'), shutoff No. 2 is reported to
be 'leaking.'
Test No. 3
Purpose: To test check valve No. 1 for tightness.
Requirements: Valve must be tight against reverse flow under all
pressure differentials. Close 'high' valve A and open test cock No. 2.
Close test cock No. 4. Disconnect vent hose at test cock No. 4.
Open valves B and C, bleeding to atmosphere. Then closing valve
B restores the system to a normal static condition. Observe the
pressure differential gauge. If there is a decrease in the indicated
value, check valve No. 1 is reported as 'leaking.'
Test No. 4
Purpose: To test operation of pressure differential relief valve.
Requirements: The pressure differential relief valve must operate
to maintain the 'zone' between the two check valves at least 2 psi
less than the supply pressure. Close 'vent' valve C. Open 'high'
valve A. Open the 'low' valve B very slowly until the differential gauge
needle starts to drop. Hold the valve at this position and observe the
gauge reading when the first discharge is noted from the relief valve.
Record this as the opening differential pressure of the relief valve.
NOTICE
The differential gauge needle MUST drop slowly. Close test
cocks No. 2 and No. 3. Use the 'vent' hose to relieve pressure
from the test kit by opening valves A, B, and C. Remove all test
equipment and open shutoff No. 2.
CAUTION
!
To prevent freezing, hold Test Kit vertically to drain differential
gauge and hoses prior to placing in case.
Ball Type Test Valves
(A)
Low Hose
(White or Red)
High Hose
(Yellow)
Test Cock
Test Cock
No. 2
Test Cock
No. 1
6
(C)
(B)
Needle
Valve
Vent Hose
(Blue)
No. 3
Test Cock
No. 4

Publicidad

loading

Este manual también es adecuado para:

Ames 4000ss-osy