Descargar Imprimir esta página

Fronius Selectiva 4.0 Serie Manual De Instrucciones página 26

Ocultar thumbs Ver también para Selectiva 4.0 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

D1, E1 and F1:
Luster terminals for connecting the mains cable are installed in platforms D1, E1
and F1.
26
L1, L2, L3, N: n=1x
1.11 ft lb. (1,5 Nm)
.79 in.
Feed the other conductors through
1
the large ferrites once each.
.79 in.
-
Wrap the conductors as tightly
as possible around the ferrites.
Bundle the conductor loops
2
around the two large ferrites with
one of the enclosed cable ties as
shown in the illustration.
Secure another cable tie approx.
3
0.79 in. (20 mm) after the large fer-
rite.
Connect mains cable connectors
1
(2) to the mains terminal in the cor-
rect order.
[1.11 ft. lb. (1.5 Nm)]
Pull the mains lead back through
1
the cable gland until the ferrite is
0.79 in. (20 mm) from the AC con-
necting plate.
Tighten cable gland.
2
[3.69 ft. lb. (5 Nm)]
3.69 ft lb.
(5 Nm)

Publicidad

loading

Este manual también es adecuado para:

Selectiva 4.0 d1 ulSelectiva 4.0 e1 ulSelectiva 4.0 f1 ul