Initial start-up
7
Initial start-up
7.1
Procedure for the ASC5000 RPA internal leak
inspection
The internal unit pressure test is performed every day.
Firstly, the service hose connections to an air conditioning system are
checked and to see whether the service connectors are installed.
If pressure is still in the hoses, it causes an error. If the service hoses
are full, a refrigerant analysis is performed and the refrigerant is then
recycled if the "Analysis OK" message appears. Afterwards, the vac-
uum test is performed. Several parts of the unit are evacuated. Once
the vacuum test has been carried out successfully, the parts of the unit
are filled with refrigerant – now a 6 minute pressure test is done with
all the solenoid valves open to immediately determine a drop in pres-
sure. After successful completion, the refrigerant is suctioned off and
the unit is available for service work.
7.2
Setting up and switching on
1. Wheel the AirConServiceCenter to the workplace and lock the front
wheels (11).
I
NOTE
During operation, the unit must be on a level, flat surface so that
measurements can be made correctly.
2. Connect the AirConServiceCenter to the mains.
3. To switch it on, set the main switch (22) to I.
The switch-on delay runs for 35 seconds and the housing is venti-
lated. The software version number then appears in the display (6)
for several seconds:
"SW": Software status
"DB": Database
"SN": Serial number
The following message then appears:
78
WAECO
ASC
5000
R-1234yf
Internal vessel
pressure
Please wait
SW
HF00
DB
P.ZZ
SN
XXXXXX
ASC5000 RPA
EN