Descargar Imprimir esta página

Pool Technologie Poolsquad iPO Ampero 8 Instrucciones De Uso página 34

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
3.2. First commissioning
BEFORE FIRST START-UP, carefully read the manual provided with the amperometric probe. This manual
contains instructions that are essential for successful start-up and optimal operation of the equipment. Follow
and comply strictly with all of this manual.
When first powering on the electronic unit, perform the programming below.
Successive
menus
Some successive security measures are displayed while the cell fills completely.
3.3. Indicators
Colour
Green
Red
3.4. Screen
If the display is flashing: information awaiting validation, or alarm triggered.
If fixed display: information confirmed or in read-only.
Settings
possible
menu
In-line
Possible settings
French
English
Deutsch
Español
Italiano
Nederlander
Portugués
From 10 to 200m3, in increments
of 10m3
Day/Month/Year
Hour/Minute
In-line
Dashboard
Status
Continuously on
Continuously on
Flashing
Possible
previews
Free chlorine rate measurement
injection is in progress.
pH measurement
corrector injection is in progress.
I
For each menu, select a setting with the
then confirm with the OK button.
Possible meanings
Production in progress
Electronics unit powered off
Alert activated
Alarm activated
Meaning
Navigation
displayed when automatic pH
buttons,
9

Publicidad

loading