E. Swing Beam Drill Locations
1. Flip 3'' x 5-1/2'' Swing Beam so Carriage Bolts point downward as shown in (Fig. 11a).
2. Install the swing hanger onto the beam by sliding over two carriage bolts (refer to (Fig. 11) for placement) and
apply two washers and two loc-nuts per Swing Hanger. Make certain to orient swing hanger as shown
in (Fig 11a).
Note: When attaching D-Ring, make certain threads are pointing up. This will help keep the D-Ring from
loosening over time.
4. Repeat for all four hangers.
WASHER
LOC-NUT
D-RINGS
21
Brentwood Assembly Instructions
Fig. 11a
WASHER
LOC-NUT