Installation
6
Process C, continued.
4.
HOI.DTHE
PIPE, remove
pipe clamp
and slide well
seal over rigid
PVC
pipe and onto well casing.
Position
assembly
so that twelve
inches of
rigid
PVC pipe protrude
from well
seal. Alternately
turn bolts on well
seal clockwise
until rubber gaskets
are tight against well casing
and rigid
PVC pipe.
APPROX.
12" OF
-- PVC PiPE
PROTRUDING
FROM WELL
SEAL
_WELL
SEAL
2.
Cement
1-1/4"
PVC elbow
onto
rigid
PVC pipe protruding
from well
seal. If desired,
some length may
be cut off of rigid PVC pipe before
cementing
elbow.
Smooth
the inside
of any rigid PVC pipe that has been
cut with
a round file or knife.
_E
1-1/4"
PVC
LBOW
TO P OF
PVC PiPE
OTRUDING
OM WELL
SEAL
6.
If you are using the FP4155,
FP4157,
or FP4150
pump,
thread a 1-1/4"
male PVC adapter
into the front of it.
Hand tighten,
then turn 1/4 turn with
crescent
wrench.
Sea[ the threaded
pipe joints
with Teflon _'* tape or
BUSHING
1-1/4"
PUMP
Teflon i.,, based pipe joint compound
approved
for
use on PVC.
Priming Shallow Well Jet Pumps
Steps 7-12
are for FP4205,
FP4207,
and FP4210
convertible
pumps. See kit instruction
sheet.
7.
8.
Open ejector
kit.
Replace nozzle
#3
with
nozzle
#2 (from
kit) and tighten
until
snug. Thread shorter
venturi
tube into
ejector
until snug.
Place gasket over
venturi
tube so that
openings
in gasket
line up with
openings
in ejector.
Gasket
Nozzle
_J
Slide bolts through
the bolt openings
on either
side of the ejector,
through
the gasket and bolt ejector
to front of
the pump. Tighten
bolts securely.
_O
BOLT
TOR
9.
Thread a 1-1/4" male PVC adapter
into front of ejector.
Hand tighten,
then turn 1/4 turn with
wrench.
Seal the threaded
pipe joints with
Teflon _* tape or Teflon _'* based pipe
joint compound
approved
for use
on PVC.
m
I_
1-1/4"
10.
11.
12.
Cement
as many
sections
and
couplings
of PVC pipe
needed
to
connect
the
PVC elbow to the 1-1/4" male PVC adapter in the front of
the pump.
Apply
2-3 wraps of Teflon _'* tape to
the male threads on the discharge
tee. Using pipe wrench,
thread 1"
discharge
tee into top of pump.
Remove
pressure gauge plug from
top of discharge
tee. TO PRIME: Put
a garden hose into top of discharge
PRESSURE
[
GAUGE
|
I_
PLUG
I
_ DISCHARGE
|
tee and fill pipes and pump
until water overflows
from top of discharge
tee. This may take several
minutes.
Thread pressure gauge and plug
into discharge
tee. Make sure all
connections
are tightly
sealed.
PRESSURE
I
GAUGE
13. Complete
all electrical
connections
as described
on page 4.
Sealing
Pipe Joints
Use only Teflon i.,, tape or Teflon i_, based joint
compounds
for making
all threaded
connections
to the pump
itself.
Do
not use pipe ioint compounds
on plastic
pumps:
they can
react with
the plastic
in pump
components.
Make sure that
all pipe joints
in the suction
pipe are air tight as we[[ as
water tight.
If the suction
pipe can suck ai;, the pump
wift
not be able to puff water from the weft.
14. Screw 1" male PVC adapter
into discharge
tee outlet.
15.
16.
Thread
10" x 1" nipple
into
pressure tank. Thread tank
cross into nipple so that the
two 1/4" holes in tank cross
face upward.
Plug two outlets
on tank cross with
two 1/4"
plugs.
Thread
1/2" boiler
drain
into
front of tank cross. Thread
1"
male PVC adapter
into inlet
side of tank cross. Connect
to
household
plumbing.
1/4" PLUGS
NIPPLE
1/2"
BOILER
DRAIN
1"MALE
PVC ADAPTER