INNOVATIVE ORBITAL SOLUTIONS
Step by step beveling
Warning: Before milling, check that:
-
The chip shield is in place on the machine.
-
The operator is wearing safety goggles, protective gloves and anti-noise ear protectors.
Machine settings are secure.
-
Advance the pipe to the stop of the motor.
-
-
Secure the pipe.
-
Start the motor.
-
Reach inside the pipe and position the workpiece guide spring behind the retractable plunger.
-
Rotate the motor around the pipe using the travel hand wheel. (Be aware of the direction of
rotation).
After completing 360°, beveling is finished; raise the retractable plunger and lift up the punch lever.
-
Turn off the motor.
-
Release the pipe.
-
Beveling is finished.
Chips protect in
working and tight
position
Direction of rotation
of the motor
Join
experience
Travel hand wheel
ATTENTION to the
direction of rotation
ON/OFF motor switch
To know: The motor is equipped with a 0V security. This
system allows the motor not to be restarted alone after a
power failure. The ON / OFF button must be turned back on.
SAS au capital de 135 720 € - RCS Romans B414 581 363 – Code APE 2841 Z – Siret 414 581 363 00028 – TVA FR13414 581 363
Tube in contact with
the stop, then tight
Penetration lever +
indexing finger
Profile tracking spring
on the back of the
indexing finger
Hand wheel for
tighten the tube
330B Route de Portes Les Valence - 26800 Etoile sur Rhône
Tél: +33 475 575 070 - commerce@axxair.com - www.axxair.com
English
- 38 -