GB
Enclosure class
Application classifica-
tion
Duty cycle
The duty cycle refers to the time as a percentage of a ten--minute period that you can weld at a cer-
tain load without overloading.
Enclosure class
The IP code indicates the enclosure class, i. e. the degree of protection against penetration by solid
objects or water. Equipment marked IP23 is designed for indoor and outdoor use.
Application class
The symbol
indicates that the power source is designed for use in areas with increased
electrical hazard.
5
INSTALLATION
The installation must be executed by a professional.
CAUTION!
This product is intended for industrial use. In a domestic environment this product may
cause radio interference. It is the user's responsibility to take adequate precautions.
5.1
Placing
Position the welding power source such way that its cooling air inlets and outlets are
not obstructed.
5.2
Electrical installation
Mains voltage
The 208/230V voltage machines are factory--configured for 230V and are fitted with
appropriate marking tape on the mains cable, the multi voltage machines are factory
configured for highest rated voltage and are not equipped with mains cable.
MM215Pe
IP 23
- - 7 - -
IP 23