6 von 31
Measures to be carried out before any service work is commenced
– Carry out appropriate safety tests on the appliance.
– Disconnect all machine utility connections in accordance with the operating instructions.
After service work has been completed, the following measures must be carried out:
– Carry out appropriate safety tests on the appliance.
– Check the appliance for correct operation.
Risk of cuts during service and maintenance work
WARNING
Components may have sharp edges.
There is a risk of cuts during service and maintenance work.
A
Protective gloves should be worn.
Danger of injury due to excess physical strain
WARNING
Danger of injury due to excess physical strain.
Spinal injuries.
A
The relation of the weight of the machines to the physical strength of the technician must be taken into account.
For machine weight details, see the operating instructions.
Fitting the fluff filter box
The arrow embossed on the top of the plinth points to the front.
A
Assemble the connection box (1) and drawer guide (2) with 6 M5 raised-head screws (3), 6 washers (4) and 6 M5
nuts (5), see Fig. 1.
The cutout (1) on the guide for the drawer is at the front, see Fig. 2.
A
Fit the filter in the drawer. For this, the front of the filter must rest on the protrusions in the drawer, see Fig. 3.
A
Slide the drawer into the fluff filter box guide.
A
Connect the machine to the fluff filter box with the supplied pipes, see Fig. 4.
en
cs
Montážní návod soklu FFK APCL
Důvod: Pomocí skříňky filtru na zachycení vláken lze odfiltrovat velká znečištění z odpadní vody pračky.
Obsažené díly
Počet
č. m.
Název
1
vodítko pro výsuv
1
výsuv
1
sítko
1
připojovací skříňka
1
klíč
2
šroub s válcovou hlavou M5 x 12
04.09.2019
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Umbau- und Montageanweisung
M.-Nr. 11313380