Assembly Of Base Rack; Assembly Of Top Shelf - Garant heavy-duty rack Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.3.

Assembly of base rack

4.3.1 Assembly of top shelf

A
A
X
X
X
X
X
36
Prior to starting assembly, it is imperative you read the section "Fastening
captive nuts"
(see section 4.2.2.).
B
Fasten 5 captive nuts (L) in the shaped cut-outs provided in the each of
the two frame elements (A).
Arrangement of diagonal struts on frame elements (AA) as per figure
4.3.1.
(View from front).
Holes in the top shelf (B) for the door option must face forward when
fitted.
Fasten top shelf (B) using 10 hex screws M8✕20 (M) and 10 plain
washers (Q).
A
AA
B
Q
L
A
Bottom view
M

Publicidad

Tabla de contenido
loading

Tabla de contenido