Installation; Unpacking And Contents Check; Battery Module Connection - Eaton 5SC 500 Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Installation

3.1 Unpacking and contents check

(1) 5SC UPS
(2) Quick start and safety instructions
(3) User manual and IPSS (Intelligent Power Software Suite) CD-ROM
(4) RS232 communication cable
(5) USB communication cable
(6) 2 connection cables for the protected equipments (500G, 750G and 1500G models)
Packing materials must be disposed of in compliance with all local regulations concerning waste.
Recycling symbols are printed on the packing materials to facilitate sorting.

3.2 Battery module connection

Caution: Before starting the UPS, please connect the internal battery.
Note: A small amount of arcing may occur when connecting the batteries.
This is normal and does not damage the UPS or present any safety concern.
Page 10
1
2
A
6
4
3
A - Remove front panel.
B - Connect the battery module
B
C - Attach the front panel.
C
5
(never pull on the wires).
619-00470-02-us (en)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

5sc 7505sc 10005sc 15005sc 500g5sc 750g5sc 1500g

Tabla de contenido