Descargar Imprimir esta página

Grohe ALLURE BRILLIANT 19 790 Manual Del Instrucciones página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Type #2 19 786
1. Install control unit and secure with screws, see Fig. [5].
2. Close water flow by turning the yoke. The mark (A) must be
on top, see Fig. [6].
3. Open the hot and cold integrated service stops, see Fig. [7].
4. While installation observe the right mounting position.
5. Installation of handle parts after adjustement, see Figs. [7]
and [8].
If the pressure balancing valve is installed too deep, the
fitting depth can be increased by 25mm or 1" with an extension
set, Part No. 47 890, see page II.
Note: The preset maximum temperature will change if the inlet
temperatures change or the setting of the water heater
thermostat is altered or if the water inlet temperature is
fluctuating.
5
7
4
English
Operation, see Fig. [9].
Select lever (D) anti-clockwise:
- Open from cold to hot water flow.
Turn lever (E) left or right:
- left open to top outlet
- right open to bottom outlet
The adjustable hot water limit stop (B) is factory set at a
position to limit maximum outlet temperature to below the hot
water supply temperature, see Fig. [7]. For installations where
there is need to modify the limit temperature, remove the limit
stop (B) and replace in a more clockwise position for colder
water, or more counter-clockwise position for hotter water.
Observe the mounting position of stop (C).
E
B
C
Open water outlet as pipeline installation is prepared.
6
8
9
A
D
E
4

Publicidad

loading

Este manual también es adecuado para:

Allure brilliant 19 786