The intermediate spaces between the floor beams guarantee the necessary subfloor ventilation for the house.
In order to check the right angles, measure the diagonals and make any necessary corrections until you have
the same values.
Do not remove the protective film from both sides of the plastic glazing in the door and window until the entire
cabin has been sufficiently treated with a wood protection agent.
The window/door panes must be sealed all round with transparent silicone for windows immediately after
assembly and painting to ensure full resistance to driving rain.
Otherwise extreme rainfall may lead to interior leaks which cause discoloration and damage to the wood. The
manufacturer will accept no liability for such damage, there will be no replacement within the scope of the
guarantee nor is it covered by the manufacturer's warranty. We therefore refer you again to our guarantee
conditions at this point.
When laying the roof boarding, care should be taken to ensure that the roof boards are not pressed tightly into
each other. Subsequent swelling of the wood as a result of moisture is unavoidable.
We recommend that you also apply a further layer of roof paper with bitumen cold bonding agent. (Not included
in the delivery!)
The roofing felt provided serves primarily as a temporary protection against the weather. We recommend
that you also apply a further layer of roof paper with bitumen cold bonding agent. (Not included in the
delivery!)
5.5. Tools
You should have the following tools to hand before beginning assembly:
Tape measure
Drill
Electric screwdriver Hammer Pencil
Burring iron
Rubber mallet
Saw
Universal cutter
Cord
Spirit level
Spanner
Vice
5.6. Abbreviations
RW = Rear wall
WS = Wall thickness
We hope you have a successful installation and wish you many happy hours enjoying your weka
product.
Copyright HRB 3662
Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße.
13