1. Prepare the Site

NOTICE: Measure your product for site preparation. Note the model number located on the blower, then
visit the product page at kohler.com for more information.
NOTICE: Provide adequate ventilation and a minimum 15 cubic feet (.4 cubic meters) of air space in the
installed location for cooling the motor and to supply sufficient air for the blower. Do not install the
blower motor closer than 1" (25 mm) from the wall or other objects.
NOTICE: Provide generous, unrestricted access to the blower. Provide access for servicing the blower
and controls. The access must be located immediately next to the blower.
NOTICE: Do not lift the bath by the piping or blower, or use the piping or blower for structural support
of the bath. To avoid damage to the bath, lift at the sides of the bath.
NOTICE: Do not support the weight of the bath by the rim. Allow for a 1/16" (2 mm) gap between the
finished material and the underside of the bath rim.
NOTICE: Ensure adequate clearance for faucets and valves.
NOTICE: Allow at least 2" (51 mm) clearance between the edge of the bath rim and the finished wall.
NOTICE: For under-mount installation, go to kohler.com for information on the optional under-mount kit
for your bath model. Follow the installation instructions included with the under-mount kit.
NOTE: Drop-in, alcove, under-mount, or corner installation is possible, depending on the product chosen.
Carefully unpack and inspect the new bath for damage before installation. If there is damage, do
not install the bath; contact your dealer.
Make sure that the flooring offers adequate support for your bath, and verify that the subfloor is flat
and level.
Construct 2x4 stud framing.
Install an access panel for servicing the blower and heated surface feature. The access panel must be
at least 30" (762 mm) wide by 15" (381 mm) high.
Install the rough plumbing.
Install the drain to the bath according to the drain manufacturer's instructions.
Protect the bath surface by positioning a clean drop cloth in the basin bottom.
Kohler Co.
Drop-In
Construct 2x4
Position the
stud framing
rough plumbing.
according to the
product dimensions.
Verify that the subfloor
offers adequate support,
and is flat and level.
5
Construct according
to the product dimensions.
Access
Panel
1204120-2-D