Daikin FFQ09Q2VJU Manual De Instalación página 11

Ocultar thumbs Ver también para FFQ09Q2VJU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CAUTION
operation is complete.
1)
Do not connect to No.3 of the terminal block for power supply or the drain pump will not operate.
When carrying out wiring work around the electrical wiring box, make sure none of the connectors come undone.
Be sure to attach the electrical wiring box cover before turning on the power.
2)
3) Attach the electrical wiring box cover as before.
Electrical wiring box cover
English
Method of adding water
Drain pipe
Drain socket
Drain pump location
(with rubber plug)
Use this outlet to
drain water from
the drain pan.
Plastic container for pouring
Tube should be about 4 inch
(100mm) long.
Screws
unit: inch (mm)
on page 17.
Terminal block for power supply
Ground
No.2
Single phase power supply
(60Hz 208/230V)
No.1
10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ffq12q2vjuFfq15q2vjuFfq18q2vju

Tabla de contenido