Descargar Imprimir esta página

Technical Specifications - Nice A5 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

A: TERMINAL BOARD DESCRIPTION
A1
Terminals 1- 2
• Earth
A2
Terminals 3 - 4 - 5
• Output for 380V/220V three-phase motor -
A3
Terminals 6 - 7 - 8
• 380V/220V three-phase power supply
A4
Terminals 6 - 7
• 220V single-phase power supply
A5
Terminal 9 - 10
• Output for flashing light or courtesy light,
A6
Terminal 15
• Input for opening limit switch (OLS)
A7
Terminal 16 (0V)
• Common input for opening limit switch (OLS)
A8
Terminal 17
• Closing limit switch input (CLS)
A9
Terminal 18
• 12V electric lock control output.
A10
Terminal 19
• Open gate pilot light output.
A11
Terminals 20 (0V)-21(24V)• 24 V ac output, max. 1A for safety
A12
Terminal 22
• Common input for STOP, step-by-step,
A13
Terminal 23
• Safety device input (FHOTO) N.C. contact
A14
Terminal 24
• Stop button input (STOP) N.C. contact
A15
Terminal 25
• Step-by-step button input (PP)
A16
Terminal 26
• Open button input (OPEN) N.A. contact
A17
Terminal 27
• Close button input (CLOSE) N.A. contact
B: ANTENNA TERMINAL BOARD DESCRIPTION
B1
Terminal 41
• Antenna unit
B2
Terminal 42
• Antenna sock
B3
Terminal 43
• 2nd radio channel output
B4
Terminal 44
• 2nd radio channel output
NOTE: Terminal board can be completely removed to make it easier to install the unit.
While securing connections and coupling the various cards, the A5 units must
not be on. If the N.C. controls or buttons are not used, join the jumpers on their
related terminals.
INSTALLATION INSTRUCTIONS
A) After completing connections as outlined above and installing all safety and
warning devices that UNI 8612 standard requires, switch on the A5 unit checking the
right voltage and make sure that there is no humming or irregular excitations.
Make sure that the STOP/PHOTO/OLS/CLS LED's are on the LED's switch off when
one of the single input is enabled. If the LED's are off, check their respective
connections at the inputs.
B) Safety devices must be perfectly aligned to ensure efficient operation of the A5
units.
C)Press the open button displaying the control with ist related LED and make sure of
the exact opening movements. If this is not so, reserve the phases of the motor(s). If
automation requires some limit switches, make sure they are working properly and
necessary, swap the opening limit switch (OLS) and closing limit switch (CLS).
D) Regulate for the working time WT and, if requested, regulate the pause time PT,
see fig. 1.
STANDARD OPERATION
With the dip switch pre-set as in fig. 1 to first step-by-step pulse or radio control, the
A5 unit opens as its firts operation preceded by an electric lock release pulse, if
installed. This operation is interrupted by the opening limit switch, if installed (OLS),
the operational timeout, or stop pulse. Throughout this operation the flashing light and
pilot light are operational.When the operation is stopped is completed, the flashing
light switches off and the open gate pilot ligth remains on. After the pause time has
elapsed, the gate is closed and then the flashing light is switched on. The end of this
operation is interrupted by the closing limit switch (CLS), if installed, the stop button
or the end of operating time. At the end of this operation, the flashing light and open
gate pilot light are switched off.
PROGRAMMABLE FUNCTIONS
• SWICH 1:
disables automatic closing.
• SWICH 1: off
automatic closing is enabled.
The gate is automatically closed after the set pause time.
• SWICH 1: on
automatic closing is disabled.
After opening the gate, the A5 unit remains paused until another pulse is given.
• SWICH 2:
enables warning time.
• SWICH 2: off
warning time is disabled.
• SWICH 2: on
warning time is enabled.
Before starting the opening or closing cycle, the flashing light switches on 4 seconds
early.
• SWICH 3:
enables temporary pause.
• SWICH 3: off
temporary pause is disabled.
output for 220V single-phase motor
clean contact
NC contact
and closing limit switch (CLS)
N.C. contact
devices protected with fuse
open & close buttons for safety devices
and open gate light
N.A. contact
While closing the gate, enabling of the photocell reverses opening motion. While
opening the gate thephotocell enabling is ignored.
• SWICH 3: on
temporary pause is enabled.
While closing the gate, enabling of the photocell causes a temporary pause in motion,
when the range of the photocells is vacant, motion is reversed causing the gate to
open. While opening the gate, enabling of the photocell causes a temporary pause
in motion, if the photocell rance is vacant, the opening operation will continue until it
is paused.
• SWICH 4:
enables temporary pause with safety devices.
• SWICH 4: off
standard operation.
• SWICH 4: on- temporary pause with safety devices is enabled.
Every time the photocell range is interrupted during pause, the set pause time is reset
and restart timing. This particular function can be adopted where automation is used
very frequently (e.g. apartment blocks, public property, car parks etc).
• SWICH 5:
enables courtesy or flashing ligh.
• SWICH 5: off
courtesy light is enabled
This conditions allows you to connect the courtesy light, thet remains on during the
end of any operation for approx. another 20 sec., to the same terminals (3/4) as the
flashing light.
• SWICH 5: on
flashing light is enabled.
The flashing light is switch on only while the gate is opened or closed.
• SWICH 6: off - SWICH 7: off - SWICH 8: off: standard step-by-step operation.
When the first step-by-step or radio pulse is sent, the gate is opened, upon the
second pulse the gate is closed and upon the third pulse, the gate is opened (1st
OPEN, 2nd CLOSE, 3rd OPEN).
• SWICH 6: on - SWICH 7: off - SWICH 8: off: mode 2 step-by-step operation.
When the first step-by-step or radio pulse is sent, the gate is opened, pause at the
second pulse, upon the third pulse the gate is closed and upon the fourth, the gate
is opened (1st OPEN, 2nd PAUSE 3rdCLOSE, 4th OPEN).
• SWICH 6: on - SWICH 7: on - SWICH 8: off: mode 3 step-by-step operation.
When the first step-by-step or radio pulse is sent, the gate is opened, upon the
second pulse motion is stopped, upon the third pulse, the gate is closed and upon the
fourth, the gate is opened (1st OPEN, 2nd STOP 3rdCLOSE, 4th OPEN).
• SWICH 6: off - SWICH 7: off - SWICH 8: on: apartment block operation.
After sending the first step-by-step pulse, motion cannot be reversed during the
opening operation. Motion can only be varied in the pause or closing stages. This
allows you to stop several consecutive commands transmitted during the opening
stage from farther away than the visible range from ending the operating cycle that
has just begun.
• SWICH 9: off
open gate pilot light without limit switches. If the system is not
fitted with limit switches, use this configuration.
• SWICH 9: on
open gate pilot light with limit switches.
If the system requires limit switches, use this configuration.
• SWICH 10:
enables temporary stop
• SWICH 10: off temporary stop is enabled.
In the opening stage, movement can be temporarily stopped with the button, thus
starting the pause stage, after which the gate is closed. When closing the gate, the
stop button stops movement until another step-by-step pulse is sent.
• SWICH 10: on standard operation.
• SWICH 11:
enables water hammer.
• SWICH 11: off standard operation.
• SWICH 11: on water hammer is enabled.
The opening stage is preceded by a closing pulse to release the electric lock. This
function is useful when environmental conditions are somewhat harsh (winter, in
snow, ice etc.) A water hammer is not induced if the warning time is enabled.

TECHNICAL SPECIFICATIONS

- POWER SUPPLY
- OPERATING TEMPERATURE
- MAX.: MOTOR RATING
- MAX.: GATE LIGHT RATING
- MAX.: 24V. OUTPUT CURRENT
- OPERATING TIME
- PAUSE TIME
- BOX DIMENSIONS
NICE srl reserves the right to make modifications at any time without prior
notice.
English
: 220 Vac / 380 Vac three-phase
220Vac single -phase
: -20°C to + 70°C
: 2 HP
: 5W 24V
: 1A
: 8 to 42 sec.
(can be increased from 8 to 118 sec.)
: 2 to 60 sec.
: 283 x 222 x 115 mm.
5

Publicidad

loading