Safety Instructions; Mechanical Installation; Electrical Installation - JB Systems Light LED GROUND WASH RGB Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ENGLISH
OPERATION MANUAL
Thank you for buying this JB Systems product. To take full advantage of all possibilities and for your own
safety, please read these operating instructions very carefully before you start using this unit.
FEATURES
This unit is radio-interference suppressed. This product meets the requirements of the current European and
national guidelines. Conformity has been established and the relevant statements and documents have been
deposited by the manufacturer.
 This device has been designed to produce decorative effect lighting and is used in light show systems.
 Multicolor RGB ground light, used for borders in parkways, entrances of discotheques, buildings, parkings,
homes, etc.
 To be used with LED-MANAGER (dmx power supply)
 54 bright LEDs behind a thick milky translucent glass cover
 Perfect RGB-color mixing
 All-weather proof IP67 design with stainless steel cover ring.
 Can be built-in any concrete (or other) floors, walls and ceilings.
 Very easy electrical connection: parallel 4-wire connection.
 Connections: 4-wires common anode (R, G, B, +24V)
 119mm overall diameter
 Longlife LED Technology!
 Power consumption = 9W only!
BEFORE USE
 Before you start using this unit, please check if there's no transportation damage. Should there be any, do
not use the device and consult your dealer first.
 Important: This device left our factory in perfect condition and well packaged. It is absolutely necessary
for the user to strictly follow the safety instructions and warnings in this user manual. Any damage caused
by mishandling is not subject to warranty. The dealer will not accept responsibility for any resulting defects
or problems caused by disregarding this user manual.
 Keep this booklet in a safe place for future consultation. If you sell the fixture, be sure to add this user
manual.
Check the contents:
Check that the carton contains the following items:
 Operating instructions
 LED GROUND WASH RGB unit

SAFETY INSTRUCTIONS:

 To protect the environment, please try to recycle the packing material as much as possible.
 This unit has protection class IP67 so it can be used outdoors when it is properly installed.
 Inexperienced persons should not operate this device.
 Maximum save ambient temperature is 45°C. Don't use this unit at higher ambient temperatures.
 The electrical installation should be carried out by qualified personal only, according to the regulations for
electrical and mechanical safety in your country.
 The cables should always be in perfect condition: switch the LED Manager immediately off when the
cables are squashed or damaged.
 This appliance must be used with the LED Manager: don't connect the unit to any dimmer pack or other
power supply.
 In the event of serious operating problems, stop using the fixture and contact your dealer immediately.
 The housing and the lenses must be replaced if it is visibly damaged.
JB SYSTEMS®
OPERATION MANUAL
1/19
LED GROUND WASH RGB
ENGLISH
 Please use the original packing when the device is to be transported.
 Due to safety reasons it is prohibited to make unauthorized modifications to the unit.
Important: Don't use the effect in the presence of persons suffering from epilepsy.
DESCRIPTION:
1. Strong stainless ring with 3 bolts used to keep the glass cover safely in place.
2. Strong glass cover with rubber sealing to ensure the enclosure is waterproof.
3. 3 screws used to fix the waterproof metal body inside the plastic niche
mounting box.
4. Waterproof metal enclosure with LED lights inside.
5. Plastic niche mounting box used to install the projector in the floor (or
wall/ceiling)

MECHANICAL INSTALLATION

 Important: The installation must be carried out by qualified service
personal only. Improper installation can result in serious injuries and/or
damage to property. Certified installation materials should be used, the
installed device should be inspected regularly for safety.
 Make sure the area around the installation place is free from unwanted persons
during installation and servicing.
 Separate the plastic niche mounting box (5) from the rest of the projector.
 First install the mounting box at the right spot in the floor. See the drawing for
more information.
 Close the projector after connecting the electrical wires (see next chapter)
 Make sure the wire inlet on the waterproof metal housing is well fastened and
sealed so that no water can come in.
 Fix the metal enclosure to the niche mounting box using the 3 screws.
 Make sure the collar on the upper side of the metal housing is free from dirt or dust.
 Make sure the glass cover and its rubber sealing are clean and put them in place.
 Install the stainless metal ring and fasten with the 3 special bolts.

ELECTRICAL INSTALLATION

The electrical installation should be carried out by qualified personal only, according to the
regulations for electrical and mechanical safety in your country.
VERY IMPORTANT: Check the user manual of the LED Manager for the maximum allowed power on
its outputs! Do not exceed this maximum allowed power! To know the total power consumption of all
LED products in a chain you simply have to count up the power consumption of all units in the chain.
Check the chapter "specifications" at the end of this manual to see the power consumption of the
different LED STRIPS!
 Since the LED Manager uses special 4pin connecters on its power outputs, we suggest to buy an optional
1m extension cable (with special male/female 4pin connectors) and to
cut the female connector. Now you can easily strip the cable. You will
find 4 colored wires inside:
 White wire: This is the common wire (anode)
 Red wire: This the power for the red LEDs (max. 50W)
 Green wire: This the power for the green LEDs (max. 50W)
 Blue wire: This the power for the blue LEDs (max. 50W)
 Just connect these 4 wires to the corresponding 4 wires of the
projector. All projectors can be connected in parallel as shown on the
drawing below. Make sure not to exceed the maximum allowed load!
JB SYSTEMS®
OPERATION MANUAL
2/19
LED GROUND WASH RGB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

B04945

Tabla de contenido