Descargar Imprimir esta página

Weka 233.2626.30.60 Instrucciones De Montaje página 4

Publicidad

Dear customer
Read these instructions through completely before assembling your product in order to avoid errors in
assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your weka product has been
delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables you
to check that all the individual parts are present. It should be retained along with the proof of purchase.
Any complaints which may arise can probably be easily rectified with this list. The item numbers on the
packing list do not correspond to the item numbers in the following assembly instructions.
We recommend that 3 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be minor
deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
RECOMMENDATIONS
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol in the
instructions will indicate when this is necessary:
Before and during assembly, protect untreated wood from direct sunlight or moisture.
Wood is a natural product. Fluctuations in colour, knots and cracks are normal and have no influence on
the statics.
A prerequisite for professional assembly is an absolutely level foundation. We recommend a raft
foundation.
An absolutely level foundation is required for expert assembly. We recommend a raft foundation.
The pavilion must be anchored to the foundation to protect against wind damage. The fixing materials
are not included in the delivery.
In order to avoid rising damp, we recommend that a barrier layer using the packaging film, roofing paper
or similar be laid between the foundation and the floor beams. Roofing paper for a barrier layer is not
included in the scope of this delivery.
In principle, you should consult an expert in wood protection agents.
We recommend that you treat all wooden components with blue stain prior to assembly.
The base frame is to be coated with a wood protection agent prior to assembly.
After completion, give the entire pavilion several coats (at least two) of a porous wood protection
scumble.
A regular application of wood protection scumble in accordance with the manufacturer's instructions is
required to protect the wood.
Technische Änderungen vorbehalten! Alle Maßangaben sind ca. Maße.
+
3
© Copyright HRB 3662

Publicidad

loading