5. Flush out all water dirt and debris in the
hot and cold water lines.
6. Install the cold and hot water supply
lines.
7. Wrap the insulating material around the
hot water supply pipe.
8. Once supply pipes are connected,
run the water through the shower and
confirm there is no leakage in any joints.
CAUTION: Do not begin trim
installation before you have checked the
waterflow and filters.
9. Install the stem adjuster into the valve.
inSTAllATion pRoCeDURe
HOT water
supply
Stem Adjuster
7
Thermostatic Mixing
valve
COLD water
supply
Thermostatic
Mixing valve