Before Installing The Appliance - Pleasant Hearth VFL2-VO24DR Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

BEFORE INSTALLING THE APPLIANCE

- Turn off gas supply to fireplace or firebox.
- Clean fireplace floor and chimney before installing log set. Seal any ash. Clean out doors to protect
the unit from down drafts.
MOUNTING ASSEMBLY PROCEDURE
- Place grate/burner assembly into firebox with the front pan facing forward.
- Drill two (2) 5/32" diameter holes approximately 1" deep.
- Anchor the front pan to the floor using the (2) Concrete Attachment Screws (Not Included).
(See Fig. 18).
- Proper installation of the grate is essential to prevent any movement of the gas logs and
controls during operation.
Mark Location using Log Set Base as Template
and drill a hole in floor of Fireplace 1" deep to
accept concrete screw. (Both Sides)
1/2 x 3/4 Hex Head
Concrete Screw
Fig. 18
20

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido