Installing the switching power supply
• Charging process complete:
lights up yellow
• Fault:
flashes yellow very quickly
SMP301-10
Item in
fig. 7, page 6
1
2
3
4
5
6
7
8
9
10
11
12
13
7
Installing the switching power supply
7.1
Fastening the switching power supply
When selecting the installation location, pay attention to the following instructions:
• The switching power supply must be installed vertically on a wall (maximum
ambient temperature 50 °C) or horizontally on the ground or on a pedestal (max-
imum ambient temperature 40 °C and maximum load 75%).
• The optimum installation position is vertically on a wall.
18
Element
Plug-in fuse F1 for output group 1 (maximum 15 A)
Plug-in fuse F2 for output group 2 (maximum 10 A)
Plug-in fuse F3 for output group 3 (maximum 7.5 A)
Plug-in fuse F4 for output group 4 (maximum 15 A)
Plug-in fuse F5 for output group 5 (maximum 15 A)
3x flat plug P5 6.3 mm for group 5
3x flat plug P4 6.3 mm for group 4
Flat plug P3 6.3 mm for group 3
Flat plug P2 6.3 mm for group 2
Flat plug P1 6.3 mm for group 1
10x flat plug P7 6.3 mm battery terminal / common earth connection
2x flat plug P6 for positive terminal battery
CI bus connection
SMP301
EN