Annex A.2
Temco SPM1-100-AC
The energy meter Temco SPM1-100-AC is used for a 1-phase installation
with up to 100 A.
The Temco power meter needs to be clipped to the mains power
cable (schematic location shown in Fig. 1), with the current flowing
in the direction as shown in Fig A2. 1 .
Only the phase-cable must be drawn through the clamp. The neutral-
cable must not be drawn through.
18