HJM ACP9001 Instrucciones De Uso página 147

Aire acondicionado portátil
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Aire ACP9001 Inglés_Maquetación 1 04/01/18 17:40 Página 147
Welding
- If you should cut or weld the refrigerant system pipes in the process
of maintaining, please follow the steps as below:
a. Shut down the unit and cut power supply
b. Eliminate the refrigerant
c. Vacuuming
d. Clean it with N2 gas
e. Cutting or welding
f. Carry back to the service spot for welding
- The refrigerant should be recycled into the specialized storage tank.
- Make sure that there isn't any naked flame near the outlet of the
vacuum pump and it's well-ventilated.
Filling the refrigerant
- Use the refrigerant filling appliances specialized for R32. Make sure
that different kinds of refrigerant won't contaminate with each other.
- The refrigerant tank should be kept upright at the time of filling refri-
gerant.
- Stick the label on the system after filling is finished (or haven't finis-
hed).
- Don't overfilling.
- After filling is finished, please do the leakage detection before test
running; another time of leak detection should be done when it's
removed.
Safety instructions for transportation and storage
- Please use the flammable gas detector to check before unload and
open the container.
- No fire source and smoking.
- According to the local rules and laws.
- 147 -
E
N
G
L
I
S
H

Publicidad

Tabla de contenido
loading

Tabla de contenido