Descargar Imprimir esta página

VMB TL-A300 Manual De Instrucciones página 11

Torre elevadora

Publicidad

Idiomas disponibles

Idiomas disponibles

N
2
N
) whilst always pulling the red
the next. DO NOT pull another red ALS
4.10 - Transport:
For the transport of the tower is necessary
completely. Once the towerlift is comple-
tely folded, place the legs and the struts
(A) in their transport compartment (S) lo-
cated at the legs, then the lift will be ready
to be transported.
5. MAINTENANCE.
5.1 -
areas, it should be changed and replaced
immediately with a new one. Do not use
the lift if the cables are in bad condition.
Only use VMB steel cables reference: DIN
3060 torsion resistant.
5.2 - The lift is supplied from the factory
completely greased. However, it is recom-
mended to periodically grease according
to use, the gearing, the axis bearings, the
PRO LIFTS S.L.
1
) and then anti-cloc-
ENGLISH
5.3 - All lifts should undergo an annual
technical inspection carried out by an
lift's elements and security systems invol-
ved in the lift's use.
5.4 - Only use original spare parts to gua-
rantee a continued security level. The
user loses all rights to warranty if any spa-
re parts other than originals are used or
to the towerlift.
5.5 - To request a spare part please in-
dicate the corresponding code which can
be found in this manual together with the
lift's serial number and year of manufac-
ture.
6. GUARANTEE.
-
The warranty period for this lift is 2 years
from the date of purchase.
PRO LIFTS S.L. promises, that from the
date of purchase and during the warranty
period to resolve any faults that may oc-
cur, produced through defect material or
fabrication. Damage caused by improper
red by this warranty.
Depósito legal y copyright. Todos los derechos reservados.
-
-
-
11

Publicidad

loading