Electrical Work - Mitsubishi Electric PUHZ-ZRP HA Serie Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 46

6. Electrical work

6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
S1
S2
S3
B
L N
S1
S2
S3
D
For Power
For Power
D
B
E
A
A Indoor unit
B Outdoor unit
C Remote controller
C
D Main switch (Breaker)
E Earth
A
A
C
E
Fig. 6-1
ZRP35, 50
F
J
I
ZRP60, 71
F
A
E
H
I
K
F Terminal block
G Indoor/Outdoor connection terminal block (S1, S2, S3)
H Service panel
I Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
J Earth terminal
Note :
If the protective sheet for the electrical box is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line. Without N-Line, it could cause damage to unit.
ZRP35, 50
J
H
ZRP60, 71
J
G
L N
Fig. 6-2
J
S1 S2 S3
J
9

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido