The inverter doesn't have to be configured after the installation of the Rapid Shutdown Box.
If settings were made in the section energy management, check this sector in the inverters
user manual. The energy manager (Relay Mode) must be set ‚ON'.
Connecting the
The hexagon nut and the spring washer required for connecting the grounding on the hold-
Rapid Shutdown
er are included in the scope of supply. The holder is galvanically connected to the Rapid
Box Grounding
Shutdown Box.
1
1
put sticker on inverter
Rapid Shutdown Box - Duo
Signal A
1
Signal B
2
3
17