* The cable tie included with all the products allows the mains cable to be secured to the mains terminal strip.
Important: the openings provided in the cabinet must be used. Do not create additional openings as
doing so may casue the device to malfunction and voids the warranty. Except locations on C38 and
C85.
Core use table
C6-C7-C23-C24-C48
75 W
None
100-150 W
OUTPUT CORE to be
installed
200-300 W
OUTPUT CORE to be
installed
400-600 W
MAINS CORE +
REPORTS CORE +
OUTPUT CORE to be
installed
3.2
Connection specifications
Mains
Batteries
Load (2 outputs)
Alarm reports* (unpluggable)
** the battery and 12 V/48 A load terminals are 35 mm²
4 Commissioning
Open the battery fuse, or for 75 W to 150 W boards equipped with an automatic reset fuse: connect the battery
wires to the terminal strip, but do not connect the battery terminals.
After the electrical connections are made (mains, loads and batteries).
1
Close the upstream mains circuit-breaker.
1
Check the load output voltage. The LED on the motherboard turns red.
2
Close the battery fuse or connect the battery terminals for 75 W to 150 W boards.
3
Check that the LED confirming correct motherboard operation is illuminated:
4
all OK: green,
5
mains fault: orange,
6
battery or charger fault, or load not present: red (this fault takes priority over a mains fault).
7
Connect the ground wire and the wire ribbon (if equipped).
8
Close the cover.
Your apparatus is in operation when the 4 green LEDs, corresponding to the mains, charger, output and
battery are illuminated.
C38-C85
None
OUTPUT CORE pre-
installed
OUTPUT CORE pre-
installed
-
75 W
100-150 W
2.5 mm²
2.5 mm²
2.5 mm²
6 mm²
2.5 mm²
6 mm²
1.5 mm²
1.5 mm²
31
RACK F3U -3U
None
OUTPUT CORE to be
installed
-
-
200-300 W
2.5 mm²
6 mm²
6 mm²
1.5 mm²
C180
-
-
OUTPUT CORE pre-
installed
FILTER/MAINS CORE
REPORTS CORE +
OUTPUT CORE pre-
installed
400-600 W
2.5 mm²
10 mm² **
10 mm² **
1.5 mm²