Filling And Draining; Fluids - IKA IC control Instrucciones De Manejo

Ocultar thumbs Ver también para IC control:
Tabla de contenido

Publicidad

Hose olive
Fig. 9
Note: Please note the permissible temperature range of
hoses. For hot fluids we recommend the IKA
hoses. When the external system is not necessary, please
seal the pump connectors IN and OUT with the existing
union nuts and stoppers.

• Filling and draining

- Before filling the fluid into the bath, open the front
cover as indicated in following figure.
Fig. 10
- Check and make sure that the drain valve is closed (the
stop position in clockwise direction, see Fig. 11).
Note: Please note information in chapter "Commis-
sioning".
- Connect the mains plug and turn on the device with
mains switch (2).
- The low level icon (
Wireless Controller (WiCo).

• Fluids

IKA
®
Designation
EG19_N10.100 (H
0 + Glycole)
2
EG34_N20.100 (H
0 + Glycole)
2
EG40_N25.100 (H
0 + Glycole)
2
EG45_N30.100 (H
0 + Glycole)
2
SI_P20.275 (Silcone Oil)
SI_N30.145 (Silicone Oil)
SY_N10.100 (Synthetic Oil)
H
O (Water*)
2
Customized 1
Customized 2
Union nut
LT 5.20
®
) appears on the display of the
Operating temperature range
(°C)
- 10 ... 100
- 20 ... 100
- 25 ... 100
- 30 ... 100
20 ... 275
- 30 ... 145
- 10 ... 100
5 ... 95
- Open the lid (16) and fill fluid to the bath.
Fig. 11
Note: Pay attention to the fluid
WARNING
level information on the display:
— Low level
— High level
(see "Fluid level" in section " Working with Wireless
Controller (WiCo)").
- To drain the fluid from the bath, connect a hose to the drain
port and turn the drain valve in counter clockwise direction
with a straight screwdriver.
Fig. 12
Safety temperature
(°C)
100
100
100
100
275
145
100
95
Drain port
Drain valve
Stop position
Flash point
(°C)
125
125
125
125
300
170
125
34

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hbc 5 controlHbc 10 control

Tabla de contenido