Step
Add an Upright Post for the Gate
3
1. Gather 1 upright, 2 clamps , and 1 -
2. Install the gate post 22 ¼" to either side of the corner upright.
Important: Do NOT have the gate span a joint in the frame. The frame can come apart at the
swedged joint.
Note: Gate Opening is 22
__________________________________________________________________________________________________
Add Top Rails
Step
4
1. Gather 4 corner rails, 2 frame rails, 14 clamps and 7 -
2. Point all top rail swedges clockwise the same as the bottom frame.
3. Connect rails to all posts (4A). Tighten all clamps as you go.
Important: Check that all posts are straight up and down. Confi rm that all nuts are tight.
5
/
" x 2" carriage bolt with nut.
16
1
/
" between posts. All swedged joints will be loose until fence fabric is installed.
4
www.petsafe.net
5
/
" x 2" carriage bolts with nuts.
16
4A
5