Mounting the floor socket
Fig. 4: Drawing on the drill holes
5. Draw the drill holes on the concrete floor and drill them.
M 25
M 20
Fig. 5:
Levering out the empty pipe entries
4
6. If required, lever out the pre-marked empty pipe entries
with
a suitable tool (e.g. slotted screwdriver).
39 |EN
UDHOME 2 G