Cabinet To Cabinet; Inserting/Moving Storage Shelf; Commissioning; Laptop Cabinet - Garant GridLine 944520 Manual De Instrucciones

Ocultar thumbs Ver también para GridLine 944520:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20

6.1. CABINET TO CABINET

A
ü Cabinets are of identical height and depth. Otherwise drill
through cabinet wall.
1. Insert four M6×12 bolts through both side walls at top and bot-
tom.
2. Screw on four M6 nuts from the other side.

6.2. INSERTING/MOVING STORAGE SHELF

CAUTION
Toppling shelves
Crush hazard and impact hazard for individual limbs.
» Make sure the shelf is in the correct position.
» The shelf must abut the rear of the cabinet, leaving no gap.
» The front edge of the shelf must not project beyond the shelf car-
rier.
C
1. Insert four shelf carriers per shelf at identical height in socket
strip.
» Shelf carrier's hooks face downwards.
2. Set the shelf down on shelf carriers.
» The shelf must abut the rear of the cabinet leaving no gap, it
must sit firmly on the shelf carrier. The front edge of the shelf
must not project beyond the shelf carrier.

7. Commissioning

7.1. LAPTOP CABINET

1. Insert the mains plug into a mains socket.

7.2. BATTERY CHARGING CABINET

1. Plug 5-pin 400-V/16-A connector into three-phase outlet socket.
2. Switch on main switch.

8. Maintenance

Interval
Action
Once a week in
1. Remove cover panel with a
rooms with nor-
standard screwdriver.
mal levels of air
2. Clean filter.
pollution
3. Put cover panel back in
place.
Once a day in
rooms with heavily
» Cover panel engages.
polluted air
Before the start of
Check for external signs of
each shift
damage, for defects and for
good condition. Check the
edges and guides for signs of
wear.
4. If defective, immediately
block access and prevent
use.
5. Have the damage repaired
immediately.
Occasionally
Grease any locks and wheels
with multi-function oil.
Tab. 1: Maintenance activities

9. Rectification of faults and malfunctions

Fault
Socket
strips are
un-
powered.

10. Technical data

10.1. G DIMENSIONS
25 mm are equivalent to 1 G.
10.2. LAPTOP CABINET
Weight
Electrical installation
Sockets
Plug socket rated voltage
USB ports
USB output voltage
USB charge current
10.3. BATTERY CHARGING CABINET
Size
Weight
Load capacity of
shelf
Load capacity of
drawers
Total load capa-
city
Performed by
Electrical installation
Trained spe-
i
For details on internal electrical installation, refer to included test re-
cialist for elec-
port.
tro-technical
Sockets
work
Plug socket rated voltage
IP Index of Protection
Cabinet shell fan
Trained person
Stage
Rated AC voltage
Frequency
Speed
Power consumption
Noise pressure level
Ambient temperature

11. Disposal

Trained special-
Comply with the national and regional environmental protection
ist for mechan-
and disposal regulations for correct disposal or recycling. Segregate
ical work
items into metals, non-metals, composite materials and consum-
ables and dispose of them responsibly.
www.hoffmann-group.com
Possible
Action
cause
Mains plug
Unplug mains plug and
not plugged
plug in again.
in.
Reset fuses.
Fuse tripped.
Switch on main switch.
No power
Switch on on/off switch on
supply.
socket.
46 kg
7x, type F
16 A
7x, USB 2.0 type A
5 V DC (± 5%)
1 A
1000/DE
1250/DE
88 kg
95 kg
100 kg
100 kg
-
-
1000 kg
1000 kg
4 socket strips with 6 sockets
each, 230 V, type F
16 A
IP 20
1~
230 V
50/60 Hz
2700 rpm
11 W
34 dB(A)
-10°C to +70°C
Performed by
Trained spe-
en
cialist for elec-
tro-technical
work.
2000/DE
120 kg
100 kg
75 kg
1000 kg
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gridline 944501Gridline 944503

Tabla de contenido