Final Setup; Level The Dryer - GE 04 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EXHAUSTING THE DRYER (cont.)
SIDE OR BOTTOM VENTING (cont.)
ADDING ELBOW AND DUCT FOR EXHAUST TO
LEFT OR RIGHT SIDE OF CABINET (cont.)
• Apply duct tape as
shown on the joint
between the dryer
internal duct and the
elbow, and also the joint
between the elbow and
the side duct.
Use 4" rigid metal ducting only inside the dryer.
Internal duct joints must be secured with tape,
otherwise they may separate and cause a safety
hazard.
ADDING ELBOW FOR EXHAUST THROUGH
BOTTOM OF CABINET
• Insert the elbow through the rear opening and
connect it to the dryer internal duct.
• Apply duct tape as
shown on the joint
between the dryer
internal duct and the
elbow, and also the
joint between the
elbow and the bottom
duct.
Internal duct joints must be secured with tape;
otherwise, they may separate and cause a safety
hazard.
ADDING COVER PLATE TO REAR OF CABINET
Plate
(Kit WE49X22606)
Connect standard metal elbows and ducts to
complete the exhaust system. Cover back opening
with the plate (kit WE49X22606) which can be
purchased from GEApplianceparts.com or a local
service provider. Place dryer in final location.
NEVER LEAVE THE BACK OPENING WITHOUT THE
PLATE.
Installation Instructions
DUCT
TAPE
Duct tape

FINAL SETUP

LEVEL THE DRYER

1
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
Raise
Lower
PLUG DRYER IN
2
Ensure proper
ground exists
before use.
DRYER START-UP
3
Press the Power button.
NOTE: If the dryer has been exposed to
temperatures below freezing for an extended
period of time, allow it to warm up before pressing
Power. Otherwise, the display will not come on.
The dryer is now ready for use.
16

Publicidad

Tabla de contenido
loading

Tabla de contenido