Assembly sequence
•
Remove the control panel from the Saunaheater. For this purpose, unscrew the two cross-head
screws at the bottom (see Fig.4).
•
Flip the control panel forward down. Then push it down and forward, and remove.
•
Feed the connection cable in through the mains lead cleat, and connect in accordance with the
wiring diagram (see Fig.5, Fig.6). Use supplied cupper bridge for N-terminals if connected to triple
phase.
•
Tighten the mains lead cleats firmly to ensure that the connection cable is firmly fixed to the
Saunaheater.
•
Reverse the sequence to reassemble the control panel. For this purpose, insert the hooks at the
back into the floor opening, and flip forward and up.
•
Screw the control panel firmly using the two cross-head screws.
Control panel fixing screws, view from below:
Front
Fig.4
Internal circuit diagram Saunaheater
Triple phase 400V AC 3/N/PE
Important information:
*
For indication of water shortage at AS24-display a jumper must be installed between terminal 1 and
4 at boil-dry protection.
Fig.5
Control panel fixing screws
Connection
cable 1
E1 Left heating element
5x1,5²
E2 Right heating element
E3 Heating plate
F1 Boil-dry protection
*
Connection
cable 2
3x1,5²
17