DRAWING
ASSEMBLY INSTRUCTIONS / INFLATION / DEFLATION
Inflate your board with the pump from BIC Sport or any pump designed for inflatable boats, and other low pressure inflatables. These
types of pump will have a hose and adapters to fit the valves on this board. Choose a smooth and clean surface to unfold your board.
1. Board valve - please see drawing to the right:
Unscrew the valve cap(1). Push button(2) in and turn approximately 90 degrees so
it is in the "OUT" position. Insert the pump hose end piece and inflate it until you
will reach the required pressure. After inflation tighten all the valve caps
(clockwise). Only the valve(s) cap can ensure final AIR TIGHTNESS. To release
air from the side tubes and bottom floor tube, remove the valve cap(1) and push
button(2) in and turn approximately 90 degrees so it is in the "IN" position.
2. Max. air pressure : the correct pressure for this item is :
Board valve: 1 bar / 15 psi
Do not exceed it.
3. The inflation procedure and sequence : please see drawing to the right:
Any use of an air compressor may result in poor performance or damage to the board, and automatically voids all
warranties. If you leave your board exposed to the hot sun, check the pressure and deflate it slightly. Otherwise
the board may become over inflated and stretch the material. The ambient temperature affects the tube's internal
pressure : a variation of 1° C/ 1.8° F causes a varia tion of the pressure in the tube of +/- 4 mBar (0.06psi)
(1) D-ring
(2) Soft Handle
(3) Valve
(4) D-ring Leash
(5) Fixed Skeg
(6) Detachable Skeg
3
(1) Valve Cap
(2) Button
(3) Valve Base