4. HOW TO USE

1. Place the lifting tower over a firm and flat
surface on its working place.
2. Remove the outriggers (H) from their
transport supports (C) and insert them into
their working positions (G) checking that
they are fixed by the safety pins (K).
3. Adjust the outrigger stabilisers (J) by
turning the cranks (I) to level the lifting
tower. Ensure it is in a vertical position
checking the bubble level.
4. Put the load on top of the lifting tower
using the suitable support, in order to make
work the weight of the load only in vertical
direction. The minimum load must be 25kg.
It is possible to manually block it with the
safety pins (A).
5. Elevation: Turn the winch handle (B)
clockwise to lift the load until the wished
position, checking that safety pins (A) are
activated (T).
6. Lowering: release the safety pins (A) doing
the step U. To release them, turn slightly
the winch handle to elevate the load. In the
normal working position, the load's weight
does not allow to release the safety pins.
Once the safety pin (A) is unblocked, turn the
Fig. 1
S
T
U
A
I
B
J
H
K
C
G
winch handle (B) anticlockwise until the load
is lowered and the first profile is completely
down. Release the safety pins (A) and keep
on lowering the lifting tower until the second
profile is completely down. Unblock the
safety pin (A) and continue lowering the
lifting tower until it is completely folded at
its minimum height. The lifting tower can be
fixed in any needed intermediate position as
well as when raising the load, fixing the safety
pin (A) in the position (S).
7. For the lifting towers' transport it is
necessary to bring down all the profiles,
releasing the safety pin (A) doing the step
U. Fix the profiles with the safety pins (A) in
position (S).

5. MAINTENANCE

1. Periodically check cable status. If the cable
seems to have broken wires or crushing,
replace immediately with a new one. Never
use the lifting tower with cables in bad
conditions. Only use galvanized steel under
EN 12385-4. Cable maximum load: 956kg.
Cable torsion resistance: 1.770N/mm². Cable
diameter: 4mm. Cable composition: 7x19+0.
2. The lifting tower is supplied fully greased
from factory. Nevertheless, the crown gear of
the winch, to the threaded bar of the stabiliser
outriggers and the profiles, because of its use
periodical greasing is recommended.
WARNING:
DO NOT GREASE OR LUBRICATE
BRAKING MECHANISM
Braking disks were greased with a special
heat and pressure resistant grease. No other
product must be used to prevent negative
influence on brake functioning.
3. Lifting tower MEGARA 150, must be
checked by an expert a minimum of once a
year as per its use.
4. Only original spare parts must be used to
ensure continued safe use. The user loses all
guarantee rights if spare parts other than the
originals are incorporated or the product is
modified in any way.
5. To request any spare part, contact the
manufacturer or an authorised distributor
within your territory.