3.3.2. Suitable car traffic (cover B125)
If the tank is installed underneath an area
with car traffic, concrete underlay (property
class C25/30) must be placed in the collar
area under the telescopic dome shaft for
trucks. The circumference of the concrete
layer to be filled in must be at least 300 mm
wide
and
Subsequently an Ottocoll M500 cord is
inserted into the groove of the telescopic
dome shaft ③, then insert the hose seal ②.
On top of the hose seal a cord of Ottocoll
M500 also needs to be applied. At last, the
concrete cover ① is placed onto the
telescopic dome shaft.
The attachment parts may only bear load
after the installation is complete (concrete is
cured).
3.3.3. Suitable for heavy load traffic (SLW40, cover D400)
A load distribution plate (property class
C40/50)
must
telescope for installations in areas with heavy
load traffic. A respective formwork and
reinforcement plan is available from the
manufacturer. An adequately compacted,
anti-capillary and draining base course must
be installed underneath the load distribution
plate. A geotextile must be laid horizontally at
the level of the tank opening. Subsequently
an Ottocoll M500 cord is inserted into the
groove of the telescopic dome shaft ③, then
insert the hose seal ②. On top of the hose
seal a cord of Ottocoll M500 also needs to be
applied. At last, the concrete cover ① is
placed onto the telescopic dome shaft.
3. Assembly and Installation
approx.
200
mm
be
installed
under
KLsepa.pop
1
300
high.
the
1
4
3
3
2
2
28

Publicidad

Tabla de contenido
loading

Tabla de contenido