Pressure tappings (Fig.2)
Both pressure tappings (d) as the caps (e) and the screws (f) necessary for installation are supplied in a plastic bag.
These pressure tappings (d) should be installed on the panel in the area of filters. Using the pre drilled holes.
The pressure tappings (d) have to be installed. If the tappings (d) are not used, the holes have to be closed with the plastic caps (e) to avoid
leakages.
d) Pressure tapping
e) Cap
f) Screw: to fix the pressure tappings
7.2. MAINTENANCE SPACE
CADB/CADT-N-D Horizontal and vertical with and without By-pass
A
B/2 + 100
B
CADB/CADT-N-D Horizontal and vertical with and without By-pass
A
MODEL
CADB/CADT-N-D 05
CADB/CADT-N-D 08
CADB/CADT-N-D 12
CADB/CADT-N-D 18
CADB/CADT-N-D 23
CADB/CADT-N-D 30
CADB/CADT-N-D 45
CADB/CADT-N-D 55
CADB/CADT-N-D 80
B/2 + 100
MODEL
CADB/CADT-N-DI/DC 05
CADB/CADT-N-DI/DC 08
C
CADB/CADT-N-DI/DC 12
CADB/CADT-N-DI/DC 18
CADB/CADT-N-DI/DC 23
CADB/CADT-N-DI/DC 30
CADB/CADT-N-D/DC 45
CADB/CADT-N-DI/DC 55
CADB/CADT-N-DI/DC 80
22
A
B
C
(mm)
(mm)
(mm)
(mm)
650
650
360
180
850
850
360
180
1050
1050
500
250
1150
1150
500
250
1300
1300
530
265
1500
1500
530
265
1600
1600
600
300
2000
2000
650
325
2150
2150
820
410
A
B
C
(mm)
(mm)
(mm)
(mm)
975
650
480
180
1150
850
480
180
1500
1050
620
250
1600
1150
620
250
1750
1300
650
265
1950
1500
650
265
2050
1600
720
300
2700
2000
820
325
2850
2150
990
410
D
E
Ø
(mm)
(mm)
178
200
228
250
278
315
303
355
340
355
390
400
415
450
515
500
553
710
D
E
Ø
(mm)
(mm)
178
200
228
250
278
315
303
355
340
355
390
400
415
450
515
500
553
710