Draw. 3 - Maxi-Canister unit: connect the aspiration ter-
minal to the tube holder E with a 30 mm ø hose then the
support F to the drain with a 20 mm ø pipe.
Draw. 4 - Mini-Separator unit: connect the draining pipe
F with the fl oor drainage, then connect the mignon elec-
tropneumatic valve E to the aspirating terminal.
Draw. 5 - The box is to be fi xed on the bracket by screwing
the provided self-threading screws on the D holes.
On testing check: the working of the maximum level probes,
the closing of the draining valve of the Maxi-Canister and
of the Mini-Separator, the draining time and the working
of the shutter-valve, as from instructions handbook.
4